Data Center Power and Cooling Systems Analysis

 
 

Assessing the electrical power required to support and cool the critical loads within the data center is essential to planning for the development of a facility that will meet the end user’s availability expectations. Brickstone experts can produce a reasonable estimate of the data center power requirements.

This helps specify the size of the Network-Critical Physical Infrastructure components that will achieve the availability determined by the needs assessment. Once the sizing determination is made, conceptual and detailed planning can go forward with the assistance of a Brickstone consulting engineer. Cost estimation can then be made based on the size and reliability configuration determined from the data center power needs assessment process described on this site.

Power & Cooling Systems Analysis leads to a data center site assessment. Brickstone's comprehensive data center assessment services provide a company with a non-biased, independent assessment of the current data center, computer room, and/or mission critical technical space, including sections on findings, critical deficiencies, and recommendations for upgrades and enhancements to mitigate scheduled and/or unscheduled downtime.

  •   Written Report of Findings and Recommendations for Improvement
  •   Power & Cooling Calculation Worksheet
  •   Prioritized List of Recommendations with Cost Impact
  •   Detailed Data Center Rating Site Scorecard